Paragon was recommended to Zenith Events to execute the engineered scaffold requirements for the charity event. Consisting of the roof level cantilevering 3m outward of the building some 220m above the ground, then dropping down 9m to create an abseiling support platform. A ground scaffold with stretcher stair 16m high was also required, with a cantilevered and counterweighted landing platform for the abseiler’s over a fragile canopy roof. This project showcases our project management and attention to detail as the logistics behind mobilising the equipment was almost more significant than the design and engineering for the scaffold.