Location: Moore River Western Australia
Duration: 2017
Sector: Infrastructure | Transport
Solutions: Scaffold management | Labour | Design and engineering | Scaffold equipment | Bridging | Falsework
Paragon delivered 35m long access and falsework scaffold bridging over the Moore River, built to withstand the heavy rains and high-water levels that occurred during the works.