Scope included full design and install of a 10.8m wide, 140m long scaffold deck secured off the existing timber piles of the bridge. This project required extensive engineering to ensure the bridge piles were capable of all imposed loads. Testament to our engineering and quality scaffold equipment, our scaffold withstood a one in 100-year flood event that occurred at the same time as the scaffold was under the bridge deck.