Skip to main content

Falsework/Shoring/Propping

A by-product of Paragon’s success are our falsework solutions. Our primary scaffold product Layher Allround is well suited to high loads. This pairing enables our clients to receive falsework design, supply and install all under one contract and one point of contact, gaining greater efficiencies from having less systems onsite. We can organise third party pre-pour inspections to keep all the falsework under one contract.

Paragon has provided significant falsework and propping for lithium plants, bridge decks in lieu of Tee roff beams, waste to energy plants, train stations, water treatment plants, and mine process facilities.

Capability Features

    • Layher Allround system
    • Heavy duty shoring / propping
    • RMD super slims
    • Quality assured products
    • Preassembly then crane to location minimising program time
    • Consideration to wind load on formwork panels for ties
    • Detailed design and engineering
    • Along with third party verifications
    • Digital register for inspection, handover
    • Pre-pour engineer inspection records
    • 200 Tonne XL Tower
    • Twixbeam